Export limit exceeded: 377205 CVEs match your query. Please refine your search to export 10,000 CVEs or fewer.
Search
Search Results (63 CVEs found)
| CVE | Vendors | Products | Updated | CVSS v3.1 |
|---|---|---|---|---|
| CVE-2018-11039 | 3 Debian, Oracle, Vmware | 33 Debian Linux, Agile Plm, Application Testing Suite and 30 more | 2024-11-21 | 5.9 Medium |
| Spring Framework (versions 5.0.x prior to 5.0.7, versions 4.3.x prior to 4.3.18, and older unsupported versions) allow web applications to change the HTTP request method to any HTTP method (including TRACE) using the HiddenHttpMethodFilter in Spring MVC. If an application has a pre-existing XSS vulnerability, a malicious user (or attacker) can use this filter to escalate to an XST (Cross Site Tracing) attack. | ||||
| CVE-2018-1000632 | 5 Debian, Dom4j Project, Netapp and 2 more | 17 Debian Linux, Dom4j, Oncommand Workflow Automation and 14 more | 2024-11-21 | 7.5 High |
| dom4j version prior to version 2.1.1 contains a CWE-91: XML Injection vulnerability in Class: Element. Methods: addElement, addAttribute that can result in an attacker tampering with XML documents through XML injection. This attack appear to be exploitable via an attacker specifying attributes or elements in the XML document. This vulnerability appears to have been fixed in 2.1.1 or later. | ||||
| CVE-2018-0735 | 7 Canonical, Debian, Netapp and 4 more | 24 Ubuntu Linux, Debian Linux, Cloud Backup and 21 more | 2024-11-21 | 5.9 Medium |
| The OpenSSL ECDSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). Fixed in OpenSSL 1.1.1a (Affected 1.1.1). | ||||